Jefferson Dredge Barn | Keeping the Barn
3rd Grade
4th Grade – 5th Grade
6th Grade – 8th Grade
English
The Jefferson Dredge barn was constructed with materials from a large dredge used to do the heavy work during the construction of the Fort Peck Dam in Montana. After the dam was completed the machinery was auctioned off. Karl Reddig bought the dredge and repurposed it to build his barn north of Frazer, MT.
